Generator Testing and Maintenance

The following is a comprehensive list of the generator tests and inspections we perform at TGM:

  • On-Line Testing
    • Partial Discharge Analysis
    • Flux Probe Testing
  • Routine Off-Line Testing—Stators
    • Insulation Resistance / Polarization Index
    • DC Winding Resistance
    • Power Factor Tip-Up and Doble Tests
    • DC Step Voltage
  • General Inspection—Stators
    • Visual Inspection
    • Wedge Tightness
    • EL-CID
    • End Winding Resonance Test
    • Capacitance Mapping Test (GE Water-Cooled Machines)
    • Tube to Tube and Tube to Resistor Resistance Measurements (Westinghouse Inner Cooled Machines)
    • Tube to Tube Pressure Drop Tests (Westinghouse Inner Cooled Machines)
    • Stator Through-Bolt Insulation Resistance Measurements (Westinghouse Machines)
    • Stator Coil Transposition Testing (Westinghouse Machines)
    • AC High Potential
  • Routine Off-Line Testing—Rotors
    • Insulation Resistance / Polarization Index
    • DC Winding Resistance
    • Static Turn Insulation Tests
  • General Inspection—Rotors
    • Visual Inspection
    • Pole Balance / Turn-to-Turn
    • AC High Potential


Back to Generator Services